Pengukuran Overall Equipment Effectiveness sebagai Indikator Awal dalam melakukan Peningkatan Volume Produksi (Sudi Kasus pada Industri Semen di Sumatera Selatan)

Edi, Furwanto and Aryanto, Aryanto and Hasan, Basri (2013) Pengukuran Overall Equipment Effectiveness sebagai Indikator Awal dalam melakukan Peningkatan Volume Produksi (Sudi Kasus pada Industri Semen di Sumatera Selatan). AVoER 5, 2013, 5 . Unsri Press, Palembang, Indonesia. ISBN 979-587-559-0

[img]
Preview
PDF - Published Version
Download (687Kb) | Preview

    Abstract

    Growth of cement demand over 10% per year at Sumbagsel in the second quarter 2013 has had the cement manufacturer to do immediate short term action such as repair the existing equipment. Implementation of preventive and corrective maintenance has been done, but the facts were not satisfactory. This study measured Overall Equipment Effectiveness (OEE) to determine how much capacity of cement plant to support its demand. Furthermore the Six Big Losses calculation has been analyzed and the causes of damage has been evaluated to observe the problems that occurred and to take corrective action on the issue. The expected results are OEE will increase to nearly 80%, and the growth of clinker production will be at least 60 thousand – 85 thousand tons per year.

    Item Type: Book
    Additional Information: Jurusan Teknik Mesin, Fakultas Teknik Universitas Sriwijaya, Jl. Raya Inderalaya Km.32, Inderalaya Koresponensi Pembicara
    Uncontrolled Keywords: Overall Equipment Effectivenes, Six Big Losses and growth of clinker production
    Subjects: T Technology > TJ Mechanical engineering and machinery
    Divisions: Faculty of Engineering > Department of Mechanical Engineering
    Depositing User: Prof. Dr. Ir Hasan Basri
    Date Deposited: 07 Apr 2017 11:49
    Last Modified: 07 Apr 2017 11:49
    URI: http://eprints.unsri.ac.id/id/eprint/7190

    Actions (login required)

    View Item