Analisis Genangan Banjir di Kawasan Sekitar Kolam Retensi dan Rencana Pengendaliannya, Studi Kasus: Kolam Retensi Siti Khadijah Palembang

Al Amin, M. Baitullah (2016) Analisis Genangan Banjir di Kawasan Sekitar Kolam Retensi dan Rencana Pengendaliannya, Studi Kasus: Kolam Retensi Siti Khadijah Palembang. Jurnal Perencanaan Wilayah dan Kota (Journal of Regional and City Planning), 27 (2). pp. 69-90. ISSN 2442-3866

[img] PDF - Published Version
Restricted to Registered users only
Available under License Creative Commons Public Domain Dedication.

Download (1905Kb) | Request a copy

    Abstract

    The area near the Siti Khadijah Palembang retention pond, especially Demang Lebar Daun street, is frequently inundated because of the overflowing of the retention pond, causing long traffic jams. This study aims to analyze the characteristics of flood inundation within the area for the existing situation and for a scenario of flood control using a pump system and an increase in open space. The flood routing within the retention pond was done using HEC-HMS software, while visualization of flood inundation was carried out using Global Mapper software. The results show that the capacity of the retention pond at this time is insufficient to accommodate run-off volume, whereas the flood peak discharge of 22.2 m3/s for a 5-year return period has the potential to inundate 11.09 Ha of the surrounding area. Flood control using pumps with a total capacity of 4 m3/s is able to reduce the inundation extent by 58.79%, while a 30% increase in open space is only able to reduce the inundation extent by 15.33%. Furthermore, a combination of flood pumps and an increase in open space can reduce the inundation extent by 75.92%. Using this method results in a maximum inundation depth of less than 0.5 m with a potential inundation time of only 20 minutes, where Demang Lebar Daun street is no longer inundated. For short-term flood mitigation, there is a need to build a flood pump station at the Siti Khadijah retention pond , while for long-term mitigation there is a need to gradually and sustainably provide open space.

    Item Type: Article
    Uncontrolled Keywords: retention pond, HEC-HMS, flood routing, flood control
    Subjects: T Technology > TA Engineering (General). Civil engineering (General)
    Divisions: Faculty of Engineering > Department of Civil Engineering
    Depositing User: M. Baitullah Al Amin
    Date Deposited: 14 Sep 2016 07:36
    Last Modified: 14 Sep 2016 07:36
    URI: http://eprints.unsri.ac.id/id/eprint/6680