ANALISIS EKSERGI PADA SISTEM PEMBANGKIT LISTRIK TENAGA PANAS BUMI (PLTP) UBP KAMOJANG UNIT PLTP 1 DARAJAT JAWA BARAT

Santoso, Dyos and Yusuf, Maulana ANALISIS EKSERGI PADA SISTEM PEMBANGKIT LISTRIK TENAGA PANAS BUMI (PLTP) UBP KAMOJANG UNIT PLTP 1 DARAJAT JAWA BARAT. ANALISIS EKSERGI PADA SISTEM PEMBANGKIT LISTRIK TENAGA PANAS BUMI (PLTP) UBP KAMOJANG UNIT PLTP 1 DARAJAT JAWA BARAT, 4 (4). pp. 134-139. ISSN 979-587-440-3

[img]
Preview
PDF (conference paper) - Published Version
Download (7Mb) | Preview

    Abstract

    This paper presents the performance analysis of geothermal power plant which consist of some main components such as final separator, steam turbine, condensor, cooling tower and others. Observed geothermal power plant is the one that is dominated by working fluid, which vapour-dominated system. Based on the result of the performance analysis using exergy analysis method, the irreversibility at final separator, steam turbin, condensor and cooling tower consecutively is 12.80 MW, 24.65 MW, 3.084 MW and 3.823 MW.

    Item Type: Article
    Subjects: T Technology > TJ Mechanical engineering and machinery
    Divisions: Faculty of Engineering > Department of Mechanical Engineering
    Depositing User: Ir. MT. Dyos Santoso
    Date Deposited: 24 Jan 2015 16:28
    Last Modified: 24 Jan 2015 16:28
    URI: http://eprints.unsri.ac.id/id/eprint/5087